Paul Crisan schreef het
volgende:
I just came from the meeting with the architect and Gyarfas
and his associate. Everything is built according the
calculation of the resistance engineer, but the certificate
of the quality can not be given until next week Wednesday
because the form master of the construction is in vacation
until Wednesday and she is the only one who has the stamp. I
promise I will send you right away as soon as I have the
certificate.
I believe the building went much faster in the way is
construct now, otherwise we had to wait a long time.
Skipping the beton beam in the attic was not cheaper like I
thought because was necessary to put more wood, bud 100% was
more faster. The attic is finished but they only have to put
the windows and the rigips. As you can see in the pictures
to put the steps again they need to build a wall. For now
everything went fast, they only need to put the bricks,
windows and doors.
I agree to build with Bela only if Gyarfas is responsible
for what Bela is doing, because to build the wall is part of
the structure also. This
work is different than to plaster the walls, painting, etc.
I agree was a very hard work with the subcontractor and
working with the Gypsies because Bela wanted to coordinate
everything.
De zigeuners krijgen een belangrijke rol bij de finishing
touch van de afbouw. Hier wat foto's uit september.